Roof Uplift Requirements

Wind uplift is a near constant force on roofs with wind movement from zero to over 170 mph.
Roof uplift requirements. These tests are necessary to understand how a metal roof system can withstand both external and internal pressures which is important when trying to meet design and performance requirements in projects. Decra roofs also have the resilience and durability to withstand the most challenging wind conditions even in florida s. These roof deck types are steel minimum 22 gauge wood cementitious wood fiber plank and structural concrete minimum 2 500 psi. Another modification provided in the april 2009 fm 1 52 is to increase the allowable deflection for metal decks.
Decra roofing profiles use a unique interlocking system high strength fasteners with documented pull out resistance and lab tested installation procedures to verify that our roofs provide wind uplift resistance far beyond the limits of conventional roofing materials. Design and performance requirements there are three tests ul 580 ul 1897 and astm e1592 that are used to determine a metal roof s uplift rating. Let s assume that the calculations for our building require a roof that can withstand 23 pounds per square foot of uplift force in the field of the roof. Because fm approvals requires a 2 1 safety factor roofs with field of roof uplift forces of 30 pounds per square foot are the maximum for 1 60 ratings and 37 5 pounds per square foot are the maximum for 1 75 ratings etc.
Wind uplift ratings are a critical safety metric for building and testing roof systems for superior wind performance.